Compaction proof per trench section
4 passages · 3 documentsBefore backfilling, prove the formation at EV2 ≥ 45 MN/m², compact the trench in layers to DPr ≥ 97 % and document the compaction with test reports, tested to ZTV E-StB.
Lexbau reads the bill of quantities, technical specifications and contracting authority requirements and turns them into a task list: every obligation with its source in the contract, the document required and how often it is due. Every proof document from the site lands on its task. Your documentation is complete at handover, and your final invoice goes out without queries.
I am a …
Supported by
Some are listed in the bill of quantities, some in the preliminary notes, the rest in the technical specifications, contracting authority requirements and change orders. Site management has to piece the full list together themselves.
The obligations are spread over hundreds of pages of bills of quantities, technical specifications and change orders.
At the start of construction, it is unclear which proof is required.
Reports, photos and delivery notes are created in the office, in the site container and on site phones.
They end up in five places. Some of them get lost.
Only now does anyone check whether everything is there and whether it meets the requirement.
Now the gaps show. Often it is too late to fill them.
Handover slips, retentions stay withheld, the final invoice sits unpaid. And people come back from their next site to fill binders.
An obligation is rarely written down in just one place. Lexbau finds the passages in the bill of quantities, preliminary notes and technical specifications, combines them into one task and keeps the source. Every task can be traced back to its line in the contract.
Example from an underground cable project, anonymized.
Before backfilling, prove the formation at EV2 ≥ 45 MN/m², compact the trench in layers to DPr ≥ 97 % and document the compaction with test reports, tested to ZTV E-StB.
Before construction starts, carry out a condition survey together with the contracting authority and hand over the photos, sorted by location, within 3 weeks.
For every HDD bore, record the installation depth every 3 m and log it in the drilling report per GW 321.
Obtain the owner’s declaration for every property affected. Without it, the work is not paid.
Lexbau turns the contract into tasks, and you set owners and deadlines. The site foreman uploads the proof, the contractor checks it, and the contracting authority sees the progress. Everyone sees only the lots they have been given access to.
| Proof | Status | Received |
|---|---|---|
| Photos before backfilling — PH 07 | complete | today 9:42 AM |
| UXO clearance — PH 08 | complete | Mon |
| Compaction report — PH 07 | open | – |
| Trench profile measurement — PH 07 | open | – |
| Task | Owner | Status | Deadline |
|---|---|---|---|
| Photos before backfilling — PH 07 | T. Krenz | checked | before backfilling |
| Compaction report — PH 07 | T. Krenz | open | per layer |
| Trench profile measurement — PH 07 | S. Ahrens | missing | after trenching |
| UXO clearance — PH 08 | S. Ahrens | checked | before construction starts |
Photograph the bedding, ducts and warning tape before the trench is closed.
Photos (2)
Photo
You see it in four places on the project.
What is missing shows up during construction. At handover, the package is complete the first time.
Every proof document has a timestamp, a source and a sender. If something from a subcontractor arrives late, that is a matter of record.
A project quickly involves 20 companies or more: contracting authorities, contractors, subcontractors, planners, surveyors. Lexbau sets no limit. In Lexbau, everyone works on the same tasks and submits their proof right there. Everyone sees the status they have been given access to.
Billed 20 t, delivered 18 t: invoice review catches it while there is still time to sort it out.
Processing and storage in German data centers.
Your documents are never used to train AI models.
Everyone sees only the lots they have been given access to.
Deleted projects are removed completely.
With your own documents from day one.
We get to know your projects and show Lexbau on a real example.
Upload your own bill of quantities as PDF, Excel or GAEB XML and see the tasks Lexbau creates from it.
With your team on a running project.
Extend it to more projects and teams.
We show you live which tasks Lexbau creates from your documents.